LIBERTY BRIDGE

  • portfolio

Project info:

The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other contractors on site, and work on a 1 week out of each month basis, over a period of 10 months to accommodate all site works. The works commenced in December 2016and are due for completion in September 2017.

Client
Categories
Category: Building
Location
Liberty Bridge Pellet Street Cardiff CF10 4FD
Surface Area:
Year Completed:
September 2017 (Due on)
Value:

Liberty Bridge

Pellet Street

Cardiff

CF10 4FD

 

The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other contractors on site, and work on a 1 week out of each month basis, over a period of 10 months to accommodate all site works.

 

The works commenced in December 2016and are due for completion in September 2017.