Project info:
The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other contractors on site, and work on a 1 week out of each month basis, over a period of 10 months to accommodate all site works. The works commenced in December 2016and are due for completion in September 2017.
Client
Categories
Location
Surface Area:
Year Completed:
Value:
Liberty Bridge
Pellet Street
Cardiff
CF10 4FD
The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other contractors on site, and work on a 1 week out of each month basis, over a period of 10 months to accommodate all site works.
The works commenced in December 2016and are due for completion in September 2017.