Abbots Grange Care Home & Offices

  • portfolio
  • portfolio
  • portfolio
  • portfolio

Project info:

The works consisted of the full demolition of the existing care home and adjacent office building, including asbestos removal and slab and foundations. The works commenced in January 2016 and were completed in March 2016, ahead of timescale with no accidents and our 90% recycling rate met.

Client
Categories
Category: Building
Location
Location: Newport Street,Oldham
Surface Area:
Year Completed:
Year completed: 2016
Value:

DESCRIPTION

The works consisted of the full demolition of the existing care home and adjacent office building, including asbestos removal and slab and foundations.

The operations of the job were carried out as follows:

  1. Services Disconnection/ diversions
  2. Asbestos Removal Prior to Demolition activities (licensed asbestos removal contractor)
  3. Site set up (BHD)
  4. Delivery of machines (BHD)
  5. Delivery of Skips(BHD)
  6. Commence Soft Strip (BHD)
  7. Commence deconstruction (BHD)
  8. Removal of Waste (BHD)
  9. Demobilisation (BHD)

The works commenced in January 2016 and were completed in March 2016, ahead of timescale with no accidents and our 90% recycling rate met.